Project Description

Project: Medical Center Hybrid OR
Client: UC Health
Location: Cincinnati, Ohio
Completed: 2015

This project for UC Health (UC Medical Center) provided renovated space for the new Hybrid Operating Room. Space was “carved out” of the existing surgery area(s) to provide state-of-the-art space for the new Hybrid Operating Room, including spaces for the OR, Imaging Equipment Room, and Support Spaces. A new Air Handler was installed to provide conditioned, humidity-controlled air to the OR and three adjacent existing Catheterization Labs.

Because of location, the new 25,000 cfm air handler was site- assembled with all components delivered through a freight elevator to the proper level. All construction work was performed within / adjacent to fully functional surgery area.

Work included a total demolition back to base building services and installation of new HVAC, Plumbing, Fire Protection, Lighting, Power, and Technology Systems for approximately 10,000 square feet of space.

Project Type: Healthcare Facility
Cost: Confidential
Area/Size: 10,000 sq.ft.
Services Provided: HVAC, Plumbing, Fire Protection, Lighting, Power, and Technology Systems.