Project Description

Project: AP Lab
Client: Nationwide Children’s Hospital
Location: Columbus, Ohio
Completed: Fall 2023

M-Engineering provided MEPT Design and Construction Administration services for the renovation of the Anatomical Pathology Lab suite at Nationwide Children’s Hospital Main Campus. This multi-phase project included full MEPT design of the lab space, including lab airflow controls, air valves, fume hoods, normal & emergency power distribution, and new exhaust ductwork infrastructure. Detailed planning and coordination to ensure all requirements of the specialty lab equipment were met was required.

Project Type: Lab
Cost: Confidential
Area/Size: 7,500 sq.ft.
Services Provided: Mechanical, Electrical, Plumbing, and Technology.